Walkway Bridge

This is a walkway bridge going over a lake. We are going to blast to near white steel. Then apply IFS Coatings zinc rich primer as a base coat before applying their semi-gloss black for the top coat. Each section of the walkway is 5’x5’x38 long. This will be two loads on our batch line which has an oven 10.5’x10.5’x55.5′ long. From start to finish this walkway will take us 10 to 12 hrs to complete.